Car before / after bearing at least a two-year warranty! (After driver / front drive)
1, No. 2 lithium grease prepared or molybdenum disulfide grease, light with 500 ml of kerosene or diesel oil, waste cloth or old clothes, a washbasin, part storage box, repair tools, markers.
2, select a good day without wind, to find a shade flat taut hand brake and put in gear choke cars can be in the post / pre-tire cover supporting a fixed fight.
3, first both sides of the front / rear fixed screw loose bolts in order according to the diagonal.
4, using the rising side of the jack front / rear triangle stent or later pad solid wooden blocks, repeat this process on the other side pad stability.
5, will have screw loose front / rear storage of parts boxes unloaded bolts.
6, unloaded front / rear.
7, unloaded front / rear brake pads (to distinguish between internal and external use marker annotations around).
8, remove the front / rear head cover bearing cap.
9, remove the basket of flowers pin fixation bolt insurance.
10, screw loose, and remove the bolts.
11, remove the internal and external wheel bearing inspection, if he has serious wear and tear should be promptly replaced!
12, no serious wear and tear, such as kerosene or diesel can be clean wipe clean.
13, will be evenly coated inside and outside the bearing grease after-loading back to its original position.
14, the basket of flowers on the bolts and then inverted back to a semi-tight.
15, rotating front / rear bearings check whether Songkuang or pulling strong, and repeat the adjustment to not Songkuang not be uprooted and fresh state.
16, installing flower baskets bolt insurance sales, front / rear axle cover cap.
17, with a clean cloth carefully wipe the brake disc, the surface of oil films,
18, check the brakes, on-chip body and the surface, where damage must be repaired or replaced promptly.
19, the installation front, according to the order on the diagonal tight bolts.
20, repeat this process to complete the other side of maintenance.
21, with the rising side of the front jack stand or remove the triangle pad bricks, jack unloading so that front / rear wheel touched the ground. Repeat this process to make the other side of front / rear wheel touched the ground.
22, with the wrench according to the diagonal tire fixed bolt tightening sequence (should be not less than 40 kilograms of torque).
Shows that a single person is about 2-3 hours to complete the maintenance.
Recent Comments